![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z157179 | ||
| Premises: 112 WEST 79 STREET MANHATTAN | BIN: 1030260 Block: 1150 Lot: 37 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 118 W 79 ST | Census Tract: 165 | Health Area: 3500 | |
| 2ND FL | Admin Area: Z - UPPER MANHATTAN | Inspection Area: E | ||
| NEW YORK, NY 10024 | Community Board: 107 | |||
| DOB Cross Street(s): COLUMBUS AVENUE, AMSTERDAM AVENUE | |||
| Status: C - JOB IS SIGNED OFF 06/09/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 09/26/2016 9:42 AM | |
| Application Entered: 09/26/2016 | Job Start Date: 09/27/2016 | ||
| Last Change: 06/09/2017 | Job End Date: 08/30/2017 | ||
| Appointment Status: | |||
| Last Inspection By: BERGMAN EDUARD On 06/09/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011769 | Licensee Name: | ZHENG LI | |
| Firm: | 003451 | Firm Name: | KJK ELECTRIC INC | |
| Firm Phone: | 917-682-3886 | Firm Address: | 79 BRIDGEWATER STREET BROOKLYN NY 11222 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 7 - HVAC WIRING |
Total Fee: $134.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: APARTMENT BUILDING | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | MARC SHORE | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 002 | 30 | 32 | 19 | 30 | ||||||||
| 002 | 2B | 7 | 16 | 5 | 7 | 2 | 2 | |||||
| Buildings Total | 37 | 48 | 24 | 37 | 2 | |||||||
| Total Units : 148 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 05/10/2017 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| OBJECTION ID | OBJECTION CODE | OBJECTION DESCRIPTION & COMMENTS | STAT | FIRST | LATEST | RESLVD | |||||||||||||
| 001 | (998) | SEE ECB VIOLATION (FLOOR: 002) LED DRIVER NOT ACCESSABLE |
RSLV | 05/10/2017 | 05/10/2017 | 06/09/2017 | |||||||||||||