BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z156570
Premises: 48 WEST 73 STREET MANHATTAN BIN: 1028646     Block: 1125   Lot: 62
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 273 COLUMBUS AV Census Tract:   157 Health Area:  4000
BASEMENT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10023 Community Board:   107
DOB Cross Street(s):   WEST 72 STREET,    WEST 73 STREET
Status:   C - JOB IS SIGNED OFF 06/29/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/17/2016 8:30 AM
Application Entered:   08/17/2016 Job Start Date:   08/17/2016
Last Change:   06/29/2017 Job End Date:   10/30/2016
Appointment Status:   
Last Inspection By:   JOHN LAUNONEN       On     05/01/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011465 Licensee Name: LEONID ARLYUK
Firm: 002921 Firm Name: WTG ELECTRIC INC.
Firm Phone: 718-474-3400  Firm Address: 115-14 BEACH CHANNEL DRIVE ROCKAWAY PARK NY 11694 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $655.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Commercial/Residential (3  Stores, 36 Apartments)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BISHOY TAKLA
Owner Business Name: BLDG MANAGEMENT CO
Authorized Representative:  BISHOY TAKLA
Relationship To Owner:   PROPERTY MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  3  4#500MCM AWG
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  3  3 SETS OF 500 MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  400A, 120/208VAC,3P,4W
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 1 + New Meters 1 - Removed Meters 1 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 08/17/2016 Notice: 1 - FIRST NOTICE 01/25/2017
Power Issued: 08/17/2016 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  UPGRADING OF THE EXISTING ELECTRICAL SERVICE FOR THE NEW TENANT 'ZUCKER BAGEL'

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z156570
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/25/2017 01/25/2017 MQY V (64) (3)
INSPECTION COMMENTS: ISSUED OBJECTION
 
(2) 05/01/2017 05/01/2017 JUU C R (40) (0)
INSPECTION COMMENTS: OBJECTIONS REMOVED

OBJECTION FOR APPLICATION #: Z156570
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(BASEMENT)WHERE THE MAIN BONDING JUMPING IS A SCREW ONLY GROUNDING ELECTRODECONDUCTOR IS TO BE LANDED ON THE NEUTRAL (250.24)A4
RSLV 01/25/2017 01/25/2017 05/01/2017
 
002 (999) OTHER
(BASEMENT) GROUND ROD NOT PROVIDED (250.52)
RSLV 01/25/2017 01/25/2017 05/01/2017
 
003 (999) OTHER
(BASEMENT)KO SEAL NEEDED IN SS, TROUPH WAS PUT TOGETHER IN A MANNER THAT ATHERE IS A OPENING BIG ENOUGH FOR A HAND. (110.12)
RSLV 01/25/2017 01/25/2017 05/01/2017



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.