BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z156306
Premises: 22 POST AVENUE MANHATTAN BIN: 1064760     Block: 2220   Lot: 41
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 22 POST AV Census Tract:   291 Health Area:  0120
BASEEMEENT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   A
NEW YORK, NY 10034 Community Board:   112
DOB Cross Street(s):   DYCKMAN STREET,    ACADEMY STREET
Status:   C - JOB IS SIGNED OFF 09/16/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/28/2016 2:26 PM
Application Entered:   07/28/2016 Job Start Date:   07/29/2016
Last Change:   09/16/2016 Job End Date:   07/29/2017
Appointment Status:   
Last Inspection By:   URIM SYLA       On     08/31/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011647 Licensee Name: MATINA KARAGIANNIS
Firm: 003820 Firm Name: DEMAND ELECTRIC INC
Firm Phone: 718-439-1600  Firm Address: 3133 31ST STREET ASTORIA NY 11106 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $102.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: NEW YORK HOLDING CO. ASSO
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  1
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  # 12

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS                       
Buildings Total                       
Total Units : 1 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  BOILER - WAMCO - MATINA

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z156306
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/31/2016 08/31/2016 UMS C (40) (0) Y
INSPECTION COMMENTS: PASS




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order