| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z156069 | ||
| Premises: 5 WEST 107 STREET MANHATTAN | BIN: 1079446 Block: 1843 Lot: 27 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 5 W 107 ST | Census Tract: 193 | Health Area: 2320 | |
| 4 TH & 5 TH FLOORS | Admin Area: Z - UPPER MANHATTAN | Inspection Area: C | ||
| NEW YORK, NY 10025 | Community Board: 107 | |||
| DOB Cross Street(s): CENTRAL PARK WEST, MANHATTAN AVENUE | |||
| Status: C - JOB IS SIGNED OFF 06/09/2022 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 07/12/2016 4:59 PM | |
| Application Entered: 07/12/2016 | Job Start Date: 07/12/2016 | ||
| Last Change: 06/09/2022 | Job End Date: 08/12/2016 | ||
| Appointment Status: | |||
| Last Inspection By: SCHULER, THOMAS On 06/09/2022 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011917 | Licensee Name: | ALTAF H SYED-NAQVI | |
| Firm: | 003528 | Firm Name: | ALSON ELEC'L CONTR. INC | |
| Firm Phone: | 718-435-1677 | Firm Address: | 1253 ROCKAWAY AVENUE BROOKLYN NY 11236 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $100.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: D4 | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JENNIFER RICO | ||||||
| Owner Business Name: | CONCORDIA APARTMENTS, LTD | ||||||
| Authorized Representative: M. SARFRAZ SAIR | |||||||
| Relationship To Owner: CONTRACTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 004 | 4 | 16 | 10 | 16 | 1 | 4 | ||||||
| 005 | 4 | 16 | 10 | 18 | ||||||||
| Buildings Total | 8 | 32 | 20 | 34 | 4 | |||||||
| Total Units : 98 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 10/06/2021 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: PANEL, GENERAL WIRING, CARBON MONOXIDE DETECTORS, SPLIT UNIT. | |||
|
|