| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
1 |
400 AMP DIST PANEL |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
07/28/2016 |
07/28/2016 |
PHG |
J |
|
|
(50) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CONTRACTOR NEEDS TO CLAIM ALL WORK REFFER TO APP NUMBER Z142833 COMPLAINT NUMBER1363674
|
| |
| (2) |
09/28/2016 |
09/29/2016 |
CPP |
N |
|
|
(30) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
NOT AWARE OF INSPECTION.
|
| |
| (3) |
10/05/2016 |
10/06/2016 |
UMS |
N |
|
|
(30) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CONTRACTOR NO SHOW. CONTRACTOR'S OFFICE SAID WE NEVER GOT ANY NOTICE FROM DOB ABOUT THE APPOINTMENT .
|
| |
| (4) |
11/04/2016 |
11/04/2016 |
CBK |
J |
|
|
(60) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CONTRACTOR NEED FILE FOR NEW FEEDERS AND PANELS. CONTRACTOR PICKED UP ALL EXISTING OBJECTION. NO PROGRESS ON JOB.
|
| |
| (5) |
03/15/2017 |
03/16/2017 |
MLF |
N |
|
|
(30) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CONTRACTOR STATED THAT THE INSPECTION WAS CANCELED BY DOB
|
| |
| (6) |
04/04/2017 |
04/06/2017 |
STP |
N |
|
|
(25) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
NO SHOW. CALLED CONTRACTOR SAID ON THE WAY.
|
| |
| (7) |
04/19/2017 |
04/20/2017 |
TUR |
N |
|
|
(50) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
NO ACCESS , CALLED THREE DIFFERENT NUMBERS NO ANSWER ONLY MACHINE, HAD THE BUILDING CALL THE NUMBER THEY ALSO JUST GOT THE MACHINE COULD NOT GAIN ACCESS TO THE EQUIPMENT WITHOUT ELECTRICIAN TO SEE WORK AND CHECK LEVEL OF FUSING INSTALLED
|
| |
| (8) |
05/08/2017 |
05/08/2017 |
EDB |
J |
|
|
(45) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
APPLICATION FILED INCORRECTLY (NO SERVICE WORK , NO NEW F/A S. SW.). NOT FINAL.
|
| |
| (9) |
05/23/2017 |
05/24/2017 |
TUR |
C |
|
|
(35) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CORRECTIONS MADE ON SITE AND ON APPLICATION ADDED FA SWITCH AND ALL FEEDERS, ALSO CORRECTION MADE ON SITE ADDITIONAL BONDING
|