Electrical Application Details for App #: Z155353
Premises: 450 WEST 63 STREET MANHATTAN BIN: 1087835     Block: 1171   Lot: 7508
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 60 RIVERSIDE BLVD Census Tract:   151 Health Area:  3900
APT. 4002 Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10069 Community Board:   107
DOB Cross Street(s):   WEST 62 STREET,    WEST 63 STREET
Status:   C - JOB IS SIGNED OFF 07/23/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/29/2016 11:08 AM
Application Entered:   05/29/2016 Job Start Date:   05/30/2016
Last Change:   07/23/2019 Job End Date:   05/29/2017
Appointment Status:   
Last Inspection By:   RICHARD REED       On     07/23/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011927 Licensee Name: MIKHAIL UMANSKIY
Firm: 003565 Firm Name: CMY ELECTRICAL CORP
Firm Phone: 718-318-3571  Firm Address: 3379 SHORE PKWY BROOKLYN NY 11235 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $80.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: ROSE ASSOSIATES
Authorized Representative:  SHANNA GARRITY
Relationship To Owner:   MANAGING AGENT


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
038  4002  29  40    24  80             
Buildings Total 29  40    24  80                
Total Units : 173 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 07/11/2019
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  JOB WAS FILED IN APP.Z140369,STARTED BUT NOT FINISHED

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z155353
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/18/2019 06/18/2019 VTC V (84) (10)
INSPECTION COMMENTS: FAIL
 
(2) 07/10/2019 07/11/2019 SWR V Y (40) (1)
INSPECTION COMMENTS: FAIL. OBJECTION EXISTS.
 
(3) 07/23/2019 07/23/2019 RDY C R (20) (0)
INSPECTION COMMENTS: INSPECTION PASSED. CONTRACTOR HAD 2 OBJECTIONS HE REMOVED 2OBJECTION AND INSTALLED 2 POLE BREAKERS ON MULTI WIRE CIRCUITS. CONTRACTOR FILED APPLICATION TO ADD MISSING PANEL AND FEEDER AND MOTORS APP #M00195145 APARTMENT 4002

OBJECTION FOR APPLICATION #: Z155353
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 ( 14) CIRCUIT OVERCURRENT PROTECTION DEVICE IS OF IMPROPER SIZE
(FLOOR: 040) FUSING 4 WIRE AT 100 1MPS
RSLV 06/18/2019 06/18/2019 07/10/2019
 
002 ( 34) KNOCKOUTS ARE NOT CLOSED IN PANEL BOX
(FLOOR: 040) KO SEALS NEEDED IN PANEL
RSLV 06/18/2019 06/18/2019 07/10/2019
 
003 ( 46) PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY
(FLOOR: 040) PANELS NOT PROVIDED WITH DIRECTORIES
RSLV 06/18/2019 06/18/2019 07/10/2019
 
004 ( 53) GFCI HAS NOT BEEN PROVIDED
(FLOOR: 040)GFCI PROTECTION NOT PROVIDED IN BATHROOM CABINETS AND OUTSIDETERRACE
RSLV 06/18/2019 06/18/2019 07/10/2019
 
005 ( 59) AFCI PROTECTION HAS NOT BEEN PROVIDED
(FLOOR: 040) AFCI NOT PROVIDED FOR ALL CIRCUITS
RSLV 06/18/2019 06/18/2019 07/10/2019
 
006 (999) OTHER
(FLOOR: 040) SIMULTANEOUS DISCONNECT NOT PROVIDED IN BOTH PANELS
RSLV 06/18/2019 06/18/2019 07/23/2019
 
007 (999) OTHER
(FLOOR: 040) BOX EXTENSIONS NEEDED IN WOOD FINISH T-OUT
RSLV 06/18/2019 06/18/2019 07/10/2019
 
008 (999) OTHER
(FLOOR: 040)2 SMALL APPLIANCE CIRCUITS NOT PROVIDED IN KITCHEN 210.52
RSLV 06/18/2019 06/18/2019 07/10/2019
 
009 (999) OTHER
(FLOOR: 040) PENINSULA OUTLET NOT PROVIDED 210.52
RSLV 06/18/2019 06/18/2019 07/10/2019
 
010 (999) OTHER
(FLOOR: 040)CONTRACTOR NEEDS TO FILE NEW APP. TO ADD 2 PANEL ONE FEEDER AND ALLMOTORS
RSLV 06/18/2019 06/18/2019 07/23/2019
 
011 (999) OTHER
(FLOOR: 034) NOTE. TWO OBJECTIONS EXISTS.
RSLV 07/10/2019 07/10/2019 07/23/2019