| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
2 |
1-400A, 1-300A |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
23 |
23-#1 |
| C. Over 1/0 to 250 MCM |
26 |
1-2/0,19-250,6-250 |
| D. Over 250 MCM |
45 |
3-350,11-500,21-400,10-60 |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
63 |
23-225A,39-100A,1-200A |
| D. 3 Phase Over 225 AMPS |
15 |
1-2500,4-800A, 10-600A |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (CELLAR) FUSE PULL OUT NOT AS PER PLANS |
RSLV |
03/09/2018 |
03/09/2018 |
04/08/2019 |
| |
| 002 |
(999) |
OTHER (CELLAR) MAINSWITCH BOARD A 2 100A BUCKETS NOT AS PER PLANS |
RSLV |
03/09/2018 |
03/09/2018 |
10/18/2018 |
| |
| 003 |
(999) |
OTHER (CELLAR) TRANSITION BOX NOT AS PER PLANS |
RSLV |
03/09/2018 |
03/09/2018 |
04/08/2019 |
| |
| 004 |
(999) |
OTHER (CELLAR) TERMINATING DIRECTLY WITH MI CABLE NOT AS PER PLANS |
RSLV |
03/09/2018 |
03/09/2018 |
10/18/2018 |
| |
| 005 |
(999) |
OTHER (CELLAR) FUSES IN MAIN SWITCH BOARD B 400A NOT AS PER PLANS |
RSLV |
03/09/2018 |
03/09/2018 |
10/18/2018 |
| |
| 006 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (FLOOR: 010)250.30 GENERATOR NOT PROPERLY BONDED/GND |
RSLV |
10/18/2018 |
10/18/2018 |
04/08/2019 |
| |
| 007 |
( 11) |
FEEDER CONDUCTORS ARE NOT OF PROPER SIZE (ALL FLOORS) 240.4, T. 310.16 OVER FUSED AL. CONDUCTORS |
RSLV |
10/18/2018 |
10/18/2018 |
04/08/2019 |
| |
| 008 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED (ALL FLOORS) 250.122, 118 AL. RISERS RUN IN PARALLEL |
RSLV |
10/18/2018 |
10/18/2018 |
04/08/2019 |
| |
| 009 |
(221) |
NOT INSTALLED PER ADVISORY BOARD DRAWING (CELLAR)AM. 110.2 INSTALLATION NOT PER DRAWING (NEUTRAL DISC.,FUSE TYPE ) |
RSLV |
10/18/2018 |
10/18/2018 |
04/08/2019 |