| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
2 |
250.00 |
| B. Each Additional 10 Floors Or Less |
2 |
166.00 |
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)ART.620.24, NOT PROVIDED GFCI RECEPTACLES IN THE PIT OF ELEVATORST-OUT. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |
| |
| 002 |
(125) |
PROTECTION OF CONDUCTORS NOT INSTALLED AS PER CODE (ROOF) ART.240.4 ,ELEVATOR TRANSFORMERS SECONDARY SIDE OVERCURRENTPROTECTION ARE NOT PROVIDED T-OUT. CAPACITY OF TRANSFORMER IS 50KVA. SECONDARY SIDE CONDUCTOR #2 AWG.TWO TRANSFORMERS,EACH CAPACITY50 KVA,SECONDARY SIDE CONDUCTOR #2AWG,FUSE RATING 150A AT THE MAINDISC.SW. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |
| |
| 003 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ROOF)ART. 250.148, MAIN DISC.SW. IS NOT GROUNDED OF ELEVATOR IP 28179.SIZE OF FUSE IS 150ATWO TRANSFORMERS,EACH CAPACITY 50 KVA,SECONDARYSIDE CONDUCTOR #2AWG,FUSE RATING 150A AT THE MAIN DISC.SW.. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |
| |
| 004 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (ROOF)ART. 620.53, NOT PROVIDED DISC. SW. FOR CAR LIGHT OF ELEVATORST-OUT. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |
| |
| 005 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (ROOF)ART. 620.53, NOT PROVIDED SIGN TO IDENTIFY THE LOCATION OF THESUPPLY SIDE OCPD FOR MAIN DISC.SW. OF ELEVATOR T-OUT. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |
| |
| 006 |
(308) |
CONDUCTORS ARE NOT PROPERLY INSTALLED/TERMINATED (ROOF) ART. 110.14 DOUBLE LUGGING IN THE X0 OF TRANSFORMERS FORGROUNDED/BONDED T-OUT. |
RSLV |
04/27/2022 |
04/27/2022 |
07/05/2022 |