BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z151830
Premises: 2201 BROADWAY MANHATTAN BIN: 1030903     Block: 1170   Lot: 7502
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 390 W END AV Census Tract:   167 Health Area:  3400
7 LNE Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10024 Community Board:   107
DOB Cross Street(s):   WEST 78 STREET,    WEST 79 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/30/2015 11:46 AM
Application Entered:   09/30/2015 Job Start Date:   09/30/2015
Last Change:   08/22/2025 Job End Date:   11/30/2015
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   FRED DORSEY       On     03/28/2017      
Field Disp:   V - OBJCTN ISSD: JOB INCOMPLT
Energize Recommendation:  
Objection Disposition:  

License #: 011777 Licensee Name: ON GUK TSE
Firm: 003385 Firm Name: HI-RITE ELECTRIC CORP
Firm Phone: 718-680-2688  Firm Address: 6508 6TH AVENUE BROOKLYN NY 11220 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $153.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: LARRY BELLONE
Authorized Representative:  LARRY BELLONE
Relationship To Owner:   SELF


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  1  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
007  7LNE  61  79    48  61         
Buildings Total 61  79    48  61              
Total Units : 254 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 03/30/2017
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z151830
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/28/2017 03/30/2017 FDY V (45) (2)
INSPECTION COMMENTS: OBJECTIONS ISSUED.

OBJECTION FOR APPLICATION #: Z151830
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(FLOOR: 007)210.12B ARC FAULT BREAKERS NEEDED FOR BRANCH CIRCUITS THROUGHOUT.
OPEN 03/28/2017 03/28/2017
 
002 (999) OTHER
(FLOOR: 007)210.8 (A)(6) GFCI NEEDED AT PROPER HEIGHT FOR KITCHEN ISLAND.
OPEN 03/28/2017 03/28/2017



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back