![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z151273 | ||
| Premises: 409 WEST 45 STREET MANHATTAN | BIN: 1090210 Block: 1055 Lot: 27 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 409 W 45 ST | Census Tract: 121 | Health Area: 4500 | |
| BASEMENT, 1ST THRU 7TH FL | Admin Area: Z - UPPER MANHATTAN | Inspection Area: G | ||
| NEW YORK, NY 10036 | Community Board: 104 | |||
| Related Job Number: 121186037 | |||
| DOB Cross Street(s): 9 AVENUE, 10 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 02/01/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/20/2015 5:12 PM | |
| Application Entered: 08/20/2015 | Job Start Date: 08/21/2015 | ||
| Last Change: 02/01/2017 | Job End Date: 07/30/2018 | ||
| Appointment Status: | |||
| Last Inspection By: SCHULER, THOMAS On 02/01/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011769 | Licensee Name: | ZHENG LI | |
| Firm: | 003451 | Firm Name: | KJK ELECTRIC INC | |
| Firm Phone: | 917-682-3886 | Firm Address: | 79 BRIDGEWATER STREET BROOKLYN NY 11222 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 2 - TEMPORARY CONSTRUCTION T - TEMPORARY LIGHT & POWER |
Total Fee: $117.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ZHAO BENTLEY | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 11 | 11 | ||||||||||
| 001 | 12 | 12 | ||||||||||
| 002 | 12 | 12 | ||||||||||
| 003 | 12 | 12 | ||||||||||
| 004 | 12 | 12 | ||||||||||
| 005 | 12 | 12 | ||||||||||
| 006 | 12 | 12 | ||||||||||
| Buildings Total | 83 | 83 | ||||||||||
| Total Units : 166 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 08/20/2015 | Notice: | |
| Power Issued: | 08/20/2015 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: TEMP METER SERVICE AND TEMP LIGHTING | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 02/01/2017 | 02/01/2017 | TUR | C | (50) | (0) | Y | |||
| INSPECTION COMMENTS: | TEMPS REMOVED PRIOR TO INSPECTION | |||||||||