|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: Z150637 |
Premises: 845 RIVERSIDE DRIVE MANHATTAN | BIN: 1063290 Block: 2135 Lot: 17 |
DOB NOW: Inspections | |||||||||||
Application Completed and Certified |
Filed: | 845 RIVERSIDE DR | Census Tract: 247 | Health Area: 0500 | |
BASEMENT | Admin Area: Z - UPPER MANHATTAN | Inspection Area: B | ||
NEW YORK, NY 10032 | Community Board: 112 | |||
DOB Cross Street(s): EDWARD M MORGAN PLACE, WEST 160 STREET | |||
Status: C - JOB IS SIGNED OFF 03/10/2016 | Balance Paid By Owner | ||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 07/17/2015 1:54 PM | |
Application Entered: 07/17/2015 | Job Start Date: 07/20/2015 | ||
Last Change: 03/10/2016 | Job End Date: 07/20/2016 |
Appointment Status: | |||
Last Inspection By: MOSES, DANIEM On 02/04/2016 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 011647 | Licensee Name: | MATINA KARAGIANNIS | |
Firm: | 003820 | Firm Name: | DEMAND ELECTRIC INC | |
Firm Phone: | 718-439-1600 | Firm Address: | 3133 31ST STREET ASTORIA NY 11106 |
Historical Licensees and Firms: | ||||
License # | Licensee Name | Firm # | Firm Name | |
011125 | PALAZZO, GERARD | 003820 | DEMAND ELECTRIC INC |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 8 - BOILER/BURNER WIRING |
Total Fee: $52.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
Building Used As: L - Five Or More Family | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | |||||||
Owner Business Name: | GOLD RIVEER CAPITAL LLC | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
BAS | 1 | 1 | ||||||||||
Buildings Total | 1 | 1 | ||||||||||
Total Units : 2 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: BOILER SWITCH - WAMCO, MATINA |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 02/04/2016 | 02/05/2016 | DNM | C | (20) | (0) | Y | |||
INSPECTION COMMENTS: | BOILER ONLY. |