![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z150114 | ||
| Premises: 215 WEST 134 STREET MANHATTAN | BIN: 1058860 Block: 1940 Lot: 124 |
| DOB NOW: Inspections | |||||||||||
| Filed: | 215 W 134TH ST | Census Tract: 228 | Health Area: 1000 | |
| 3RD FLOOR | Admin Area: Z - UPPER MANHATTAN | Inspection Area: B | ||
| NEW YORK, NY 10030 | Community Board: 110 | |||
| Special Place Name: APT 3R | ||||
| DOB Cross Street(s): ADAM CLAYTON POWELL JR BOULEVARD, FREDERICK DOUGLASS BOULEVARD | |||
| Status: K - CLOSED/CANCELLED 02/23/2018 | |||
| Request Type: P - PICK-UP | eFiled: YES | ||
| Application Entered: 01/03/2017 | Job Start Date: 01/04/2017 | ||
| Last Change: 02/23/2018 | Job End Date: 07/04/2017 | ||
| COMPLETION FEE WAS BILLED | |||
| Appointment Status: | Complaint Number: 1397470 | ||
| Last Inspection By: MOSES, DANIEM On 02/22/2018 | |||
| Field Disp: K - OK TO CANCEL | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 009791 | Licensee Name: | JOSEPH B JORDAN | |
| Firm: | 004329 | Firm Name: | GOTHAM WIRING LICENSED | |
| Firm Phone: | 718-295-6430 | Firm Address: | 649A EAST 183RD STREET ELECTRICAL CONTRACTORS IN BRONX NY 10458 | |
| Removal of ECB Violation(s): 35123361N | ||||||||
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | OZGUR ULUDAG | ||||||
| Owner Business Name: | PAD MANAGEMENT LLC | ||||||
| Authorized Representative: JOSEPH JORDAN | |||||||
| Relationship To Owner: CONTRACTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 003 | 3R | 1 | ||||||||||
| Buildings Total | 1 | |||||||||||
| Total Units : 1 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 06/12/2015 | |
| Power Issued: | Response: | F - FILED TO REMOVE OBJECTION 01/03/2017 |
| Follow-Up: | K - (CLOSED) 01/03/2017 | ||
| Contractor's Comments: NO APP ON FILE/ WE DIDN?T SEE ANY NEW WORK PERFORMED BUT WE CONFIRMED ALL IS SAFE AND LEGAL/ FILED TO REMOVE Z150114 AND ECB VIOLATION# 35123361N | |||
|
|