| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
6 |
200A 3 PHASE |
| C. 201 Up to 600 AMPS |
1 |
600A 3 PHASE |
| D. 601 Up to 1200 AMPS |
3 |
800 A 3 PHASE |
| E. Over 1200 AMPS |
1 |
2500A 3 PHASE |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
6 |
#2/0 |
| D. Over 250 MCM |
10 |
600 & 350 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
2 |
42 CKT 3 PHASE |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL (BASEMENT)VISUAL INSPECTION OBSERVED 2 SERVICE SWITCHES TOTAL OF 3100 AMPS,NEED A/B APPROVAL AM. 110.2 |
RSLV |
04/12/2019 |
04/12/2019 |
05/01/2019 |
| |
| 002 |
( 14) |
CIRCUIT OVERCURRENT PROTECTION DEVICE IS OF IMPROPER SIZE (BASEMENT) FUSING FOR BOILER PANEL OVER SIZED |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 003 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (BASEMENT) BOTH PANELS NEED DIRECTORIES |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 004 |
(999) |
OTHER (BASEMENT)CONTRACTOR NEEDS TO OPEN NEW APP. TO REFLECT JUST 1 2500 AMP.SERVICE SWITCH, SHO4 4 PANELS OVER 225 AMPS., 2 PANELS UP TO 225 A.AND CORRECT FEEDER AMOUNT |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 005 |
(999) |
OTHER (BASEMENT) RACEWAY NOT CONTINUOUS WITH G.E.C. 250.62C |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 006 |
(999) |
OTHER (BASEMENT) DURABLE LABELS NOT PROVIDED FOR EQUIPMENT 110.22 |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 007 |
(999) |
OTHER (BASEMENT)SIMULTANEOUS DISCONNECT NOT PROVIDED AND GROUPING 210.4B,D |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 008 |
(999) |
OTHER (BASEMENT) FIRESTOP NOT PROVIDED 300.21 |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 009 |
(999) |
OTHER (BASEMENT) INTERSYSTEM GROUND NOT PROVIDED 250.94 |
OPEN |
05/01/2019 |
05/01/2019 |
|
| |
| 010 |
(999) |
OTHER (BASEMENT)NEUTRAL DISCONNECT LINK NOT PROVIDED FOR SWITCHGEAR 408.60 NYC AMD. |
OPEN |
05/01/2019 |
05/01/2019 |
|