![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z149155 | ||
| Premises: 27 WEST 72 STREET MANHATTAN | BIN: 1087511 Block: 1125 Lot: 7502 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 27 W 72 ST | Census Tract: 157 | Health Area: 4000 | |
| APT 707 | Admin Area: Z - UPPER MANHATTAN | Inspection Area: E | ||
| NEW YORK, NY 10023 | Community Board: 107 | |||
| DOB Cross Street(s): CENTRAL PARK EXIT WEST 72 ST, COLUMBUS AVENUE | |||
| Status: C - JOB IS SIGNED OFF 05/25/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/17/2015 10:22 AM | |
| Application Entered: 04/17/2015 | Job Start Date: 04/17/2015 | ||
| Last Change: 05/25/2017 | Job End Date: 04/30/2015 | ||
| Appointment Status: | |||
| Last Inspection By: URIM SYLA On 05/24/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 009113 | Licensee Name: | MARTIN WEINSTEIN | |
| Firm: | 000796 | Firm Name: | JOSEPH WEINSTEIN ELECTRIC | |
| Firm Phone: | 718-843-5555 | Firm Address: | 94-24 88TH STREET CORP OZONE PARK NY 11416 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ENRIQUE CUBILLO | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 007 | 1 | |||||||||||
| Buildings Total | 1 | |||||||||||
| Total Units : 1 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 04/19/2017 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|