![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z146495 | ||
| Premises: 304 WEST 55 STREET MANHATTAN | BIN: 1025417 Block: 1045 Lot: 37 |
| Application Completed and Certified | ||
| Filed: | 310 W 55 ST | Census Tract: 139 | Health Area: 4600 | |
| WEST 55 SREET APT 6E | Admin Area: Z - UPPER MANHATTAN | Inspection Area: F | ||
| NEW YORK, NY 10019 | Community Board: 104 | |||
| DOB Cross Street(s): 8 AVENUE, 9 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 05/08/2015 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/12/2014 6:18 PM | |
| Application Entered: 10/12/2014 | Job Start Date: 10/14/2014 | ||
| Last Change: 05/08/2015 | Job End Date: 03/14/2015 | ||
| Appointment Status: | |||
| Last Inspection By: FENTY, WAYNE On 03/04/2015 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 012254 | Licensee Name: | JEAN-CLAUDE BELIZAIRE | |
| Firm: | 004007 | Firm Name: | DREAM TEAM ELEC'L CORP | |
| Firm Phone: | 718-276-0076 | Firm Address: | 517 EAST 132ND STREET, 3RD FL BRONX NY 10454 | |
| Work Started or Filed by Others: YES | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $66.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | FLAVIO CAMPOS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 006 | 25 | 20 | 2 | 10 | ||||||||
| Buildings Total | 25 | 20 | 2 | 10 | ||||||||
| Total Units : 57 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALL NEW RECEPTACLES, INSTALL NEW SWITCHES, INSTALL NEW LIGHTS AND MOVE THE ELECTRICAL PANEL FROM THE CLOSET | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 03/04/2015 | 03/09/2015 | WYF | C | (45) | (0) | Y | |||
| INSPECTION COMMENTS: | NONE | |||||||||