Electrical Application Details for App #: Z145243
Premises: 315 WEST 70 STREET MANHATTAN BIN: 1030930     Block: 1182   Lot: 20
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 315 W 70 ST Census Tract:   159 Health Area:  3900
APT 14E Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10023 Community Board:   107
DOB Cross Street(s):   WEST END AVENUE,    FREEDOM PLACE
Status:   C - JOB IS SIGNED OFF 04/08/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/18/2014 2:40 PM
Application Entered:   07/18/2014 Job Start Date:   07/18/2014
Last Change:   04/08/2019 Job End Date:   07/30/2014
Appointment Status:   
Last Inspection By:   MOSES, DANIEM       On     04/05/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 009113 Licensee Name: MARTIN WEINSTEIN
Firm: 000796 Firm Name: JOSEPH WEINSTEIN ELECTRIC
Firm Phone: 718-843-5555  Firm Address: 94-24 88TH STREET CORP OZONE PARK NY 11416 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: NEIL DANNENBERG
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
014                       
Buildings Total                       
Total Units : 1 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z145243
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/08/2019 03/09/2019 EDB N (35) (0) Y
INSPECTION COMMENTS: NO ACCESS BY BUILDING AND OWNER. SCHEDULED AFTER 9AM AS REQUESTED
 
(2) 03/28/2019 03/28/2019 EDB N (45) (0) Y
INSPECTION COMMENTS: CALL CONTRACTOR, ON THE WAY (MIA). NO SHOW.
 
(3) 04/05/2019 04/06/2019 DNM C (16) (0) Y
INSPECTION COMMENTS: (1) GFCI IN BATHROOM. APT (14E).