Electrical Application Details for App #: Z144142
Premises: 345 WEST 145 STREET MANHATTAN BIN: 1061124     Block: 2053   Lot: 1
   
Application Completed and Certified

Filed: 700 SAINT NICHOLAS AV Census Tract:   231 Health Area:  0720
BASEMENT & ROOF LEVEL Admin Area:   Z - UPPER MANHATTAN Inspection Area:   B
NEW YORK, NY 10031 Community Board:   109
Special Place Name:   CAPITAL ONE
DOB Cross Street(s):   WEST 145 STREET,    WEST 146 STREET
Status:   C - JOB IS SIGNED OFF 08/15/2014
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/02/2014 5:12 PM
Application Entered:   05/02/2014 Job Start Date:   05/02/2014
Last Change:   08/15/2014 Job End Date:   08/21/2014
Appointment Status:   
Last Inspection By:   JAMES PERRONE       On     07/30/2014      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011456 Licensee Name: RALPH OCCHIPINTI
Firm: 000064 Firm Name: ADCO ELEC'L CORP
Firm Phone: 718-494-4400  Firm Address: 201 EDWARD CURRY AVENUE STATEN ISLAND NY 10314 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $191.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   BANK BRANCH
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ALLISON EASTER
Owner Business Name: HILLVIEW OWNERS CORPORATI
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  1  3 - #600KCIL, #3/0G
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  3PHASE 600A MCB
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
CEL                     
ROF                     
Buildings Total       12                
Total Units : 16 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  EA JOB# 140103 - INSTALL NEW 3PHASE 600AMP MCB FOR NEW FEEDS TO POWER UP UNITS IN THE CELLAR AND ROOF FOR BANK BRANCH.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z144142
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/30/2014 08/05/2014 JAP C (60) (0) Y
INSPECTION COMMENTS: NONE