Electrical Application Details for App #: Z140952
Premises: 125 WEST 82 STREET MANHATTAN BIN: 1070806     Block: 1213   Lot: 7503
   
Application Completed and Certified

Filed: 127 W 82 ST Census Tract:   169 Health Area:  3500
APT 8 B Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10024 Community Board:   107
DOB Cross Street(s):   COLUMBUS AVENUE,    AMSTERDAM AVENUE
Status:   C - JOB IS SIGNED OFF 03/20/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/21/2013 9:20 PM
Application Entered:   08/21/2013 Job Start Date:   09/10/2013
Last Change:   03/20/2015 Job End Date:   03/30/2014
Appointment Status:   
Last Inspection By:   URIM SYLA       On     03/12/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010604 Licensee Name: DOMINICK QUARANTA
Firm: 001834 Firm Name: DOMINICK QUARANTA
Firm Phone: 718-829-6346  Firm Address: 1705 CASTLE HILL AVE. BRONX NY 10462 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $65.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: PHILLP HOUCK
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  20 CRI
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
MEZ    10  20  19               
Buildings Total 10  20  19                  
Total Units : 53 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WORK IN APT 8 B ONLY

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z140952
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/12/2015 03/20/2015 UMS C (40) (0) Y
INSPECTION COMMENTS: NONE