Electrical Application Details for App #: Z139662
Premises: 128 LAUREL HILL TERRACE MANHATTAN BIN: 1063589     Block: 2149   Lot: 112
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 142 LAUREL HILL TERRACE Census Tract:   267 Health Area:  0210
OUTSIDE/SIDEWALK Admin Area:   Z - UPPER MANHATTAN Inspection Area:   A
NEW YORK, NY 10040 Community Board:   112
DOB Cross Street(s):       AMSTERDAM AVENUE
Status:   C - JOB IS SIGNED OFF 06/25/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/22/2013 2:48 PM
Application Entered:   05/22/2013 Job Start Date:   05/22/2013
Last Change:   06/25/2019 Job End Date:   05/22/2014
Appointment Status:   
Last Inspection By:   GARY MCCALLA       On     01/30/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011953 Licensee Name: IRVING BAPTISTE
Firm: 003611 Firm Name: RPJ ELECTRIC CORP
Firm Phone: 718-241-0277  Firm Address: 3421 CHURCH AVENUE BROOKLYN NY 11203 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $48.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   MULTI-FAMILY ELEVATO
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: STUART BERGER
Owner Business Name: S.W. MANAGEMENT LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    22      22             
Buildings Total 22      22                
Total Units : 45 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL SIDEWALK SHED LIGHTING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z139662
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/30/2019 01/31/2019 GYM C (35) (0) Y
INSPECTION COMMENTS: NO SHED IN FRONT.