Electrical Application Details for App #: Z138131
Premises: 1 WEST 72 STREET MANHATTAN BIN: 1028637     Block: 1125   Lot: 25
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 1 W 72 ST Census Tract:   157 Health Area:  4000
APT. 50 Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10023 Community Board:   107
DOB Cross Street(s):   CENTRAL PARK EXIT WEST 72 ST,    COLUMBUS AVENUE
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/23/2013 7:42 AM
Application Entered:   01/23/2013 Job Start Date:   01/23/2013
Last Change:   08/22/2025 Job End Date:   04/30/2013
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 011132 Licensee Name: ERICK V GREENE
Firm: 001209 Firm Name: R-2 ELECTRIC INC
Firm Phone: 212-989-9090  Firm Address: PIER-63 NO. RIVER NEW YORK NY 10011 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $123.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MR. & MRS. GREILS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  3 # 2 WIRES
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  1  42 CIRCUIT PANEL
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
005  50  31  46    24  31         
Buildings Total 31  46    24  31              
Total Units : 133 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 40 + New Meters 1 - Removed Meters 1 = Total Meters 40

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 01/23/2013 Notice:  
Power Issued: 01/23/2013 Response:  

Follow-Up:
Contractor's Comments:  

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER Z138131
INSPECTION FOR APPLICATION #: Z138131
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back