BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z136160
Premises: 100 MORNINGSIDE DRIVE MANHATTAN BIN: 1059518     Block: 1963   Lot: 16
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 100 MORNINGSIDE DR Census Tract:   207.01 Health Area:  1800
BUILDING Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10027 Community Board:   109
DOB Cross Street(s):   WEST 120 STREET,    WEST 121 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/03/2012 4:04 PM
Application Entered:   08/03/2012 Job Start Date:   08/06/2012
Last Change:   08/22/2025 Job End Date:   06/12/2013
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 009916 Licensee Name: ALFONSO DIFUSCO
Firm: 001453 Firm Name: TWINS ELECTRIC CORP.
Firm Phone: 718-292-5536  Firm Address: 695 EAST 132 STREET SUITE 205 BRONX NY 10454 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $1,215.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: COLUMBIA UNIVERSITY
Authorized Representative:  MARK KERMAN
Relationship To Owner:   ASST. VICE PRESIDENT


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  3  3-PHASE 800AMP FUSED DISC
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  6  500MCM SETS
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  42-CIRCUIT 3-PHASE PANEL
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 55 #4-Wire 0 #10-Wire 1
Existing Meters 56 + New Meters 0 - Removed Meters 0 = Total Meters 56

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 08/03/2012 Notice:  
Power Issued: 08/03/2012 Response:  

Follow-Up:
Contractor's Comments:  REPLACING EXISTING SWITCHGEAR WITH NEW GEAR

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER Z136160
INSPECTION FOR APPLICATION #: Z136160
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back