Electrical Application Details for App #: Z135135
Premises: 2381 FREDERICK DOUGLASS BOULEVARD MANHATTAN BIN: 1089108     Block: 1954   Lot: 36
   
Application Completed and Certified

Filed: 300 W 128 ST Census Tract:   215 Health Area:  8520
WEST 128TH STREET Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10027 Community Board:   110
DOB Cross Street(s):   FREDERICK DOUGLASS BOULEVARD,    ST NICHOLAS AVENUE
Status:   C - JOB IS SIGNED OFF 09/21/2012
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/25/2012 11:53 AM
Application Entered:   05/25/2012 Job Start Date:   05/25/2012
Last Change:   09/21/2012 Job End Date:   06/30/2012
Appointment Status:   
Last Inspection By:   KAFFETZAKIS, MICHAIL       On     08/16/2012      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 009599 Licensee Name: NICOLO ARGANO
Firm: 004016 Firm Name: CHASE ARGANO ELECTRIC INC
Firm Phone: 718-529-4016  Firm Address: 97-46 99TH STREET OZONE PARK NY 11416 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $415.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   I - Hospital Or Health Facility
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: FRED LEATHERS
Owner Business Name: DATA DRIVEN DELIVERY SYST
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  4  500MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  1  400A 3PHASE4 WIRE 42CBP
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                       
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 1 + New Meters 0 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 05/25/2012 Notice:  
Power Issued: 05/25/2012 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z135135
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/16/2012 08/25/2012 MFF C E (15) (0) Y
INSPECTION COMMENTS: NONE