| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
200 AMP 1 PHASE |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
SET 3/0 |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
3 |
42 CIRCUIT PANELS |
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 29) |
OUTLET BOXES ARE NOT COVERED 4TH FL: THROUGH-OUT |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 002 |
( 30) |
OUTLET BOXES ARE NOT SECURED 4TH FL: THROUGH-OUT |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 003 |
(315) |
CONDUCTORS NOT PROPERLY IDENTIFIED 2ND FL: NEUTRAL NOT IDENTIFIED |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 004 |
(999) |
OTHER THROUGH-OUT: BOXES NOT FLUSH WITH COMBUSTIBLE MATERIAL IN BOXBOARDS - 314.20 |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 005 |
( 29) |
OUTLET BOXES ARE NOT COVERED BOILER ROOM: THROUGH-OUT |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 006 |
(250) |
NO OTHER CONDUCTORS IN RACEWAY CELLAR: LINE AND LOAD IN SAME RACEWAY....... - 230.7 |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |
| |
| 007 |
( 24) |
ARMORED CABLES ARE NOT PROPERLY SECURED CELLAR: MC NOT PROPERLY SUPPORTED IN CELLAR..... - 320.30 |
RSLV |
09/25/2012 |
09/25/2012 |
01/18/2013 |