| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
2 |
2 - 400A 3PH DISC. |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
2 |
2 SETS -600MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
19 |
19 - 1PH 12CIR PANELS |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
1 - 3PH 125A PANEL |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(229) |
SPLICE BOXES NOT ACCESSIBLE (FLOOR: 007)APT #72, ACCESS TO J-BOXES AND CONDUIT BODIES (ALL SPLICE BOXESACCESSIBLE) 314.29/WIRING NOT ACCESSIBLE/-314.72(D), FOR NEW CIRCUITSPLICING TO OLD EXISTING CIRCUIT TO APTS. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 002 |
(999) |
OTHER (ALL FLOORS)PAA, CONTRACTOR NEED TO ADD, FEEDERS, 1 SET OVER 250 MCM, TOTAL 3SET INSTALLED,- 2 SET OVER 1/0 TO 250 MCM, TOTAL 2 SET INSTALLED,-26 SET UP TO #2, TOTAL 26 SET INSTALLED.- CONTRACTOR TO REVISED APPSFOR COMMERCIAL 4 WIRE METERS NOT INSTALLED. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 003 |
( 10) |
BRANCH CIRCUIT CONDUCTORS ARE NOT PROPER SIZE (BASEMENT)AM 210.19(A)(4), 14 AWG USED FOR BRANCH CIRCUITING/ AT ELEVATOR DISSW. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 004 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT) 300.5(G) END LINE BOX, RACEWAY NOT SEALS |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 005 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)110.16, ARC FLASH LABEL NOT PROVIDED AT NEW ELECTRICAL EQUIPINSTALLED/ AT ALL COMMERCIAL DIS SW/EQUIP. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 006 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)GROUNDING ELECTRODE CONDUCTOR NOT SIZED PROPERLY 250.66/ AT 400 AMPSER SW REQ 1/0 AWG. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 007 |
(235) |
MAIN BREAKER NOT BOLTED IN (BASEMENT) 408.36(D)/ MAIN BREAKER NOT BOLT ON AT PLP PANELS |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 008 |
( 34) |
KNOCKOUTS ARE NOT CLOSED IN PANEL BOX (BASEMENT) 110.12(A), KO MISSING AT PLP PANELS AND APT # 72. |
OPEN |
12/14/2023 |
12/14/2023 |
|
| |
| 009 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (BASEMENT) 408.4 DIRECTORY MISSING AT PLP PANELS, |
OPEN |
12/14/2023 |
12/14/2023 |
|