![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z131481 | ||
| Premises: 581 AMSTERDAM AVENUE MANHATTAN | BIN: 1032284 Block: 1219 Lot: 1 |
| Application Completed and Certified | ||
| Filed: | 589 AMSTERDAM AV | Census Tract: 173 | Health Area: 3220 | |
| WISE TOWERS HOUSES | Admin Area: Z - UPPER MANHATTAN | Inspection Area: D | ||
| NEW YORK, NY 10024 | Community Board: 107 | |||
| DOB Cross Street(s): WEST 88 STREET, WEST 89 STREET | |||
| Status: C - JOB IS SIGNED OFF 11/06/2012 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 08/09/2011 | Job Start Date: 07/25/2011 | ||
| Last Change: 11/06/2012 | Job End Date: 02/25/2012 | ||
| Appointment Status: | |||
| Last Inspection By: AGELONIAS, ANASTASIOS On 10/18/2012 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011276 | Licensee Name: | GENNADIY M GAKMAN | |
| Firm: | 002144 | Firm Name: | APPROVED ELEC CONT'G INC | |
| Firm Phone: | 718-232-4785 | Firm Address: | 1436 HYLAN BOULEVARD STATEN ISLAND NY 10305 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $0.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | NYCHA | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 002 | 2H | 6 | ||||||||||
| 007 | 7B | 6 | ||||||||||
| 007 | 7C | 7 | ||||||||||
| 010 | 10D | 5 | ||||||||||
| 011 | 11A | 6 | ||||||||||
| 011 | 11E | 5 | ||||||||||
| Buildings Total | 35 | |||||||||||
| Total Units : 35 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALLATION OF SMOKE CARBON MONOXIDE DETECTORS AND STROBE LIGHT | |||
|
|