NYC Department of Buildings | ||
Electrical Application Details for App #: Z129264 |
Premises: 510 WEST 159 STREET MANHATTAN | BIN: 1090361 Block: 2117 Lot: 30 |
DOB NOW: Inspections | |||||||||||
Application Completed and Certified |
Filed: | 510 W 159 ST | Census Tract: 2450 | Health Area: 0500 | |
SIDEWALK SHED & LIGHTING | Admin Area: Z - UPPER MANHATTAN | Inspection Area: B | ||
NEW YORK, NY 10032 | Community Board: 112 | |||
DOB Cross Street(s): AMSTERDAM AVENUE, BROADWAY | |||
Status: C - JOB IS SIGNED OFF 06/26/2023 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 02/24/2011 2:13 PM | |
Application Entered: 02/24/2011 | Job Start Date: 02/25/2011 | ||
Last Change: 06/26/2023 | Job End Date: 02/20/2012 |
Appointment Status: | |||
Last Inspection By: GARY MCCALLA On 06/25/2023 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 010985 | Licensee Name: | LINDEN J TUDOR | |
Firm: | 002700 | Firm Name: | LINTECH ELECTRIC, INC | |
Firm Phone: | 718-941-3766 | Firm Address: | 3006 TILDEN AVENUE BROOKLYN NY 11226 |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
Building Used As: Z - Other | |||||||
Store / Other: SIDEWALK SHED | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | ILBER PILKU | ||||||
Owner Business Name: | BILLY CONTRACTORS | ||||||
Authorized Representative: ILBER PILKU | |||||||
Relationship To Owner: CONTRACTOR |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
GND | 1 | 2 | ||||||||||
Buildings Total | 1 | 2 | ||||||||||
Total Units : 3 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 06/25/2023 | 06/26/2023 | GYM | C | (35) | (0) | Y | |||
INSPECTION COMMENTS: | COMPLETE. (CONTRACTOR WASN'T PRESENT) |