BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z127618
Premises: 622 9 AVENUE MANHATTAN BIN: 1024982     Block: 1035   Lot: 1
   

DOB NOW: Inspections


Filed: 630 9TH AV Census Tract:   1210 Health Area:  4500
BASEME NT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   G
NEW YORK, NY 10036 Community Board:   104
DOB Cross Street(s):   WEST 44 STREET,    WEST 45 STREET
Status:   C - SIGNOFF IS AWAITING FEE PAYMENT 04/04/2019
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/21/2010 9:36 AM
Application Entered:   09/21/2010 Job Start Date:   09/22/2010
Last Change:   04/04/2019 Job End Date:   10/13/2010
Appointment Status:   
Last Inspection By:   MARCIN DUBAJ       On     04/03/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011290 Licensee Name: JAMES FILARDI
Firm: 002857 Firm Name: CROSS HUDSON ELEC'L INC.
Firm Phone: 718-347-3536  Firm Address: 240-21 BRADDOCK AVENUE BELLEROSE NY 11426 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $130.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: CHRIS WOOLBERT
Owner Business Name: CLEARWIRE WIRELESS LLC
Authorized Representative:  LUIS BUSTOS
Relationship To Owner:   PROJECT MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 09/21/2010 Notice:  
Power Issued: 09/21/2010 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z127618
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/03/2019 04/04/2019 MJD C (30) (0) Y
INSPECTION COMMENTS: PASS, CLEARWIRE WIRELESS LLC DOES NOT EXIST IN THIS LOCATION ANYMORE, NEW BUSINESS JUICE PRESS WORK FILED AND INSPECTED WITH APP# Z148645




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order