Electrical Application Details for App #: Z125162
Premises: 31 TIEMANN PLACE MANHATTAN BIN: 1075481     Block: 1995   Lot: 7501
   
Application Completed and Certified

Filed: 31 TIEMANN PL Census Tract:   211 Health Area:  1400
31 TIEMANN PLACE Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10027 Community Board:   109
Special Place Name:   BROADWAY
DOB Cross Street(s):   BROADWAY,    CLAREMONT AVENUE
Status:   C - JOB IS SIGNED OFF 02/24/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/18/2010 3:50 PM
Application Entered:   03/18/2010 Job Start Date:   03/18/2010
Last Change:   02/24/2011 Job End Date:   04/18/2010
Appointment Status:   
Last Inspection By:   CHARLES COURTNEY       On     02/17/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011697 Licensee Name: MICHAEL MURPHY
Firm: 002280 Firm Name: ASSOCIATED ELEC CONT OF N
Firm Phone: 718-882-9520  Firm Address: 27 EAST 233RD STREET NY INC. BRONX NY 10470 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $78.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: FREDRICK M WILLIAMS
Owner Business Name: CLEAR WIRELESS LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  100 AMP SWITCH
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  SET OF # 2
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  100 AMP PANEL
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
ROF             
Buildings Total               
Total Units : 10 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 60 + New Meters 1 - Removed Meters 0 = Total Meters 61

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 03/18/2010 Notice:  
Power Issued: 03/18/2010 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  NEW 100AMP SERVICE SWITCH AND M,ETER FOR CLEARWIRE COMMUNICATIONS SITE.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z125162
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/17/2011 02/24/2011 CCH C E (45) (0) Y
INSPECTION COMMENTS: NONE