BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z121349
Premises: 50 MANHATTAN AVENUE MANHATTAN BIN: 1055398     Block: 1838   Lot: 21
   
Application Completed and Certified

Filed: 50 MANHATTAN AV Census Tract:   189 Health Area:  3210
50 MANHATTAN AVENUE Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10025 Community Board:   107
Special Place Name:   POWER SOLUTIONS
DOB Cross Street(s):   WEST 102 STREET,    WEST 103 STREET
Status:   C - JOB IS SIGNED OFF 06/23/2009
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/14/2009 10:36 AM
Application Entered:   04/14/2009 Job Start Date:   04/14/2009
Last Change:   06/23/2009 Job End Date:   05/14/2009
Appointment Status:   
Last Inspection By:   PELUSO, RICHARD       On     06/12/2009      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010856 Licensee Name: JOSEPH NAPPI
Firm: 003561 Firm Name: RNH ELECTRIC COMPANY INC
Firm Phone: 646-216-8100  Firm Address: 516 INDUSTRIAL LOOP, STE 201 STATEN ISLAND NY 10309 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $90.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   CELLULAR SITE
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: KEITH STEELE
Owner Business Name: POWER SOLUTIONS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  200 AMP
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                   
Total Units : 3 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL 200 AMP RISER

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z121349
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/12/2009 06/23/2009 RPL C (30) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back