Electrical Application Details for App #: Z120906
Premises: 521 WEST 122 STREET MANHATTAN BIN: 1059670     Block: 1977   Lot: 18
   
Application Completed and Certified

Filed: 521 W 122 ST Census Tract:   211 Health Area:  1400
STREET Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10027 Community Board:   109
DOB Cross Street(s):   AMSTERDAM AVENUE,    BROADWAY
Status:   C - JOB IS SIGNED OFF 10/25/2013
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/06/2009 10:46 AM
Application Entered:   03/06/2009 Job Start Date:   03/06/2009
Last Change:   10/25/2013 Job End Date:   06/06/2009
Appointment Status:   
Last Inspection By:   IACOPETTA, JOSEPH       On     09/19/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011078 Licensee Name: EUGENE FITZGERALD
Firm: 002446 Firm Name: E. FITZGERALD ELEC CO INC
Firm Phone: 718-945-6828  Firm Address: 633 3RD AVE 17 FLOOR STE 1731 NEW YORK NY 10017 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   SIDEWALK BRIDGE
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: VLAD RESTORATION
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                     
Buildings Total                     
Total Units : 10 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  BRIDGE LIGHTING

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z120906
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/19/2013 09/19/2013 JIC C (15) (0) Y
INSPECTION COMMENTS: C




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.