![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z118564 | ||
| Premises: 208 WEST 84 STREET MANHATTAN | BIN: 1032789 Block: 1231 Lot: 40 |
| Filed: | 208 W 84 ST | Census Tract: 171 | Health Area: 3400 | |
| TEMP SIDEWALK SHED | Admin Area: Z - UPPER MANHATTAN | Inspection Area: D | ||
| NEW YORK, NY 10024 | Community Board: 107 | |||
| DOB Cross Street(s): AMSTERDAM AVENUE, BROADWAY | |||
| Status: K - CLOSED/CANCELLED 03/01/2010 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/11/2008 3:14 PM | |
| Application Entered: 08/11/2008 | Job Start Date: 08/12/2008 | ||
| Last Change: 03/01/2010 | Job End Date: 09/30/2008 | ||
| Appointment Status: | |||
| Last Inspection By: DALTON HENLON On 02/19/2010 | |||
| Field Disp: K - OK TO CANCEL | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010985 | Licensee Name: | LINDEN J TUDOR | |
| Firm: | 002700 | Firm Name: | LINTECH ELECTRIC, INC | |
| Firm Phone: | 718-941-3766 | Firm Address: | 3006 TILDEN AVENUE BROOKLYN NY 11226 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
2 - TEMPORARY CONSTRUCTION |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: TEMP SIDWALK SHED | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | SURJIT SINGH | ||||||
| Owner Business Name: | H & B CONSTRUCTION | ||||||
| Authorized Representative: SURJIT SINGH | |||||||
| Relationship To Owner: OWNER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 3 | |||||||||||
| Total Units : 3 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 02/19/2010 | 03/01/2010 | DAH | K | (5) | (0) | ||||
| INSPECTION COMMENTS: | GRIDGE REMOVED | |||||||||