Electrical Application Details for App #: Z117743
Premises: 2381 FREDERICK DOUGLASS BOULEVARD MANHATTAN BIN: 1089108     Block: 1954   Lot: 33
   
Application Completed and Certified

Filed: 2375 FREDERICK DOUGLAS BLVD Census Tract:   213.02 Health Area:  8520
O/D Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10027 Community Board:   110
DOB Cross Street(s):   WEST 127 STREET,    WEST 128 STREET
Status:   C - JOB IS SIGNED OFF 11/24/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/13/2008 11:59 AM
Application Entered:   06/13/2008 Job Start Date:   06/20/2008
Last Change:   11/24/2015 Job End Date:   07/20/2008
Appointment Status:   
Last Inspection By:   MICHAEL QUERY       On     11/19/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011917 Licensee Name: ALTAF H SYED-NAQVI
Firm: 003528 Firm Name: ALSON ELEC'L CONTR. INC
Firm Phone: 718-435-1677  Firm Address: 1253 ROCKAWAY AVENUE BROOKLYN NY 11236 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
2 - TEMPORARY CONSTRUCTION
9 - OTHER
Total Fee:  $40.00
Other Work:   S. WALK SHED LIGHTING
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   C4 - WALK UP APTS.
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: GURCHARAN SINGH
Owner Business Name: LAKHI GENERAL CONTRACTOR
Authorized Representative:  GURCHARAN SINGH
Relationship To Owner:   CONTRACTOR - G


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 4 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLING TEMPORARY LIGHTS UNDER SIDE WALK SHED BRIDGE. 45L. F.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z117743
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/19/2015 11/24/2015 MQY C (25) (0) Y
INSPECTION COMMENTS: SHED REMOVED PRIOR TO INSPECTION




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.