Electrical Application Details for App #: Z116623
Premises: 317 WEST 90 STREET MANHATTAN BIN: 1034075     Block: 1251   Lot: 12
   
Application Completed and Certified

Filed: 317 W 90 ST Census Tract:   179 Health Area:  3120
BASEMENT Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10024 Community Board:   107
DOB Cross Street(s):   WEST END AVENUE,    RIVERSIDE DRIVE
Status:   C - JOB IS SIGNED OFF 10/31/2008
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/27/2008 10:00 AM
Application Entered:   03/27/2008 Job Start Date:   03/27/2008
Last Change:   10/31/2008 Job End Date:   08/31/2008
Appointment Status:   
Last Inspection By:   DALTON HENLON       On     10/24/2008      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  R - REMOVED

License #: 011651 Licensee Name: KEUNG CHEUNG
Firm: 003209 Firm Name: SUN ELECTRIC, INC.
Firm Phone: 212-334-6708  Firm Address: 39 DIVISION STREET 3FL NEW YORK NY 10002 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $117.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ALEX BORUKHOVICH
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  4  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 4 #4-Wire 0 #10-Wire 0
Existing Meters 4 + New Meters 4 - Removed Meters 4 = Total Meters 4

Power Auth Flag: K - CANCELLED Objection Flag:
Power Requested: 03/27/2008 Notice: 1 - FIRST NOTICE 08/13/2008
Power Issued: 03/27/2008 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z116623
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/05/2008 08/13/2008 WMK A B (30) (2) Y
INSPECTION COMMENTS: SEE VIOLATION DETAILS
 
(2) 10/24/2008 10/31/2008 DAH C R E (30) (0) Y
INSPECTION COMMENTS: NONE

OBJECTION FOR APPLICATION #: Z116623
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
BASE: CONNECTION TO WATER PIPE EXCEED 5'ART.250.52
RSLV 08/05/2008 08/05/2008 10/24/2008
 
002 (999) OTHER
BASE: MORE THAN 6 SVC DISC MEANSART.230.71(A)
RSLV 08/05/2008 08/05/2008 10/24/2008