BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z113126
Premises: 602 WEST 112 STREET MANHATTAN BIN: 1057331     Block: 1894   Lot: 56
   

Filed: 610 W 112 ST Census Tract:   199 Health Area:  2310
ROOF Admin Area:   Z - UPPER MANHATTAN Inspection Area:   C
NEW YORK, NY 10025 Community Board:   109
Special Place Name:   BROADWAY
DOB Cross Street(s):   BROADWAY,    RIVERSIDE DRIVE
Status:   K - CLOSED/CANCELLED 12/24/2007
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/10/2007 6:58 PM
Application Entered:   07/10/2007 Job Start Date:   07/16/2007
Last Change:   12/24/2007 Job End Date:   09/30/2007
Appointment Status:   
Last Inspection By:   HINDS EUGENE       On     12/16/2007      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011565 Licensee Name: ROBERT HERNANDEZ
Firm: 003080 Firm Name: M.E. ELECTRIC, INC.
Firm Phone: 718-784-9085  Firm Address: 47-04 GREENPOINT AVENUE QUEENS NY 11104 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $56.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: LESLY PIERRE
Owner Business Name: BANK STREET COLLEGE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  2  2- 30 AMP DISCONNECTS
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 2 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL 2-30 AMP DISCONNECT SWITCHES FOR WHEEL CHAIR LIFTS AND 2-20 AMP CKTS FOR 4-DOOR CLOSERS

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z113126
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/16/2007 12/24/2007 EHD K (10) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back