BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z104818
Premises: 117 WEST 133 STREET MANHATTAN BIN: 1058225     Block: 1918   Lot: 24
   
Application Completed and Certified

Filed: 111 W 133 ST Census Tract:   226 Health Area:  1200
ENGINE 59 FIRE HOUSE Admin Area:   Z - UPPER MANHATTAN Inspection Area:   B
NEW YORK, NY 10030 Community Board:   110
DOB Cross Street(s):   LENOX AVENUE,    ADAM CLAYTON POWELL JR BOULEVARD
Status:   C - JOB IS SIGNED OFF 08/07/2007
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   05/31/2005 Job Start Date:   05/18/2005
Last Change:   08/07/2007 Job End Date:   09/15/2005
Appointment Status:   
Last Inspection By:   BANYA, E       On     07/30/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010814 Licensee Name: JOHN E VILLAFANE
Firm: 003660 Firm Name: ELDOR ELECTRIC LLC
Firm Phone: 718-883-1030  Firm Address: 18-15 129TH STREET COLLEGE POINT NY 11356 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
9 - OTHER
Total Fee:  $97.50
Other Work:   EXISTING GENERATORS BEING MOVED OUTDOORS
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   FIRE HOUSE
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: NELSON HERNANDEZ
Owner Business Name: FDNY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total              60           
Total Units : 60 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  EXISTING GENERATOR BEING MOVED OUTDOORSSERVICE SWITCH EXISTING NEW SERVICE CONDUCTORS FROM GENERATOR TO TRANSFER SWITCH

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z104818
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/30/2007 08/07/2007 EBA C (40) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back