![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Z101552 | ||
| Premises: 302 COLUMBUS AVENUE MANHATTAN | BIN: 1030071 Block: 1146 Lot: 30 |
| Application Completed and Certified | ||
| Filed: | 302 COLUMBUS AV | Census Tract: 161 | Health Area: 3500 | |
| NONE | Admin Area: Z - UPPER MANHATTAN | Inspection Area: E | ||
| NEW YORK, NY 10023 | Community Board: 107 | |||
| DOB Cross Street(s): WEST 74 STREET, WEST 75 STREET | |||
| Status: C - JOB IS SIGNED OFF 04/06/2005 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 08/10/2004 | Job Start Date: 08/04/2004 | ||
| Last Change: 04/06/2005 | Job End Date: 12/12/2004 | ||
| Appointment Status: | |||
| Last Inspection By: CASTRO MARIO On 02/03/2005 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 009939 | Licensee Name: | WARREN GANNES | |
| Firm: | 001705 | Firm Name: | GANECO ELECTRIC CORP. | |
| Firm Phone: | 718-882-1638 | Firm Address: | 1086 E. GUNHILL ROAD BRONX NY 10469 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $205.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: K - Store | |||||||
| Store / Other: DELI | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | SEI BUNG CHU | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 50 | 20 | 10 | 50 | ||||||||
| Total Units : 130 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 08/10/2004 | Notice: | 1 - FIRST NOTICE 12/08/2004 |
| Power Issued: | 08/10/2004 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|