| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
4 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
1 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (ALL FLOORS) COMMON AREAS NOT FROM PLP METER 210.25 |
OPEN |
08/08/2023 |
08/08/2023 |
|
| |
| 002 |
(999) |
OTHER (ALL FLOORS)CONTRACTOR NEED TO FILE NEW APP TO ADD 1-200 AMP SERVICE SWITCH2-100 AMP SERVICE SWITCH FOR TOTAL OF THREE. 1-3/0 AWG SERVICECONDUCTORS , 3 DISCONNECT SWITCHES , 4-3 AWG FEEDER CONDUCTORS,TOTAL DEVICES ,TOTAL METERS |
OPEN |
08/08/2023 |
08/08/2023 |
|
| |
| 003 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT) MISSING GEC 250.64, 250.66 |
OPEN |
08/08/2023 |
08/08/2023 |
|
| |
| 004 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT) NO MAIN BONDING JUMPER FOR ALL SERVICE SWITCHES 250.28 |
OPEN |
08/08/2023 |
08/08/2023 |
|