Electrical Application Details for App #: Z086303
Premises: 319 WEST 94 STREET MANHATTAN BIN: 1034178     Block: 1253   Lot: 10
   

Filed: 319 W 94 ST Census Tract:   183 Health Area:  3110
CC#1085099 3 4 5 6 FLS Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10025 Community Board:   107
DOB Cross Street(s):   WEST END AVENUE,    RIVERSIDE DRIVE
Status:   C - COMPLETED
Request Type:   C - COMPLAINT eFiled:   NO
Application Entered:   03/08/2001 Job Start Date:  
Last Change:   03/31/2014 Job End Date:  
Appointment Status:   
Last Inspection By:   HUGH MCKESSEY       On     03/31/2014      
Field Disp:   Q - NO OBJECTION EXISTS
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: Licensee Name: UNKNOWN
Firm: Firm Name: UNKNOWN
Firm Phone:   Firm Address:  

Work Started or Filed by Others: NO
Work Category:    Work To Be Done:   Total Fee:  $0.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: MEL-AP HOTEL CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: R - ORDER TO REMEDY 04/26/2001
Power Issued: Response:  

Follow-Up: K - (CLOSED) 03/21/2001
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z086303
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/13/2001 03/21/2001 PGR W (60) (6)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 03/31/2014 03/31/2014 HMC Q R (5) (0) Y
INSPECTION COMMENTS: BUILDING DEMO.SEE APPL.#Z130137,Z143648