Premises: 2659 BROADWAY MANHATTAN BIN: 1056504     Block: 1873   Lot: 10
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 229 W 101 ST Census Tract:   187 Health Area:  3110
111898 BSMT/STORE FRO Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10025 Community Board:   107
DOB Cross Street(s):   BROADWAY,    WEST END AVENUE
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   01/04/2001 Job Start Date:   12/29/2000
Last Change:   08/22/2025 Job End Date:   03/10/2001
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   GARY MCCALLA       On     12/19/2003      
Field Disp:   H - NO PROGRESS ON JOB
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  X - NOT REMOVED

License #: 011464 Licensee Name: THOMAS E JOCELYN III
Firm: 001324 Firm Name: SCIENTIFIC ELEC. CO. INC
Firm Phone: 718-320-2023  Firm Address: 1475 EAST 222ND STREET BRONX NY 10469 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $168.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   ANIMAL HOSP
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: KINZER ASSOCIATES, INC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
SUB FEEDERS (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 27  26    15  27     16           
Total Units : 111 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag: V - OBJECTION(S) EXIST
Power Requested: 01/04/2001 Notice: C - CALL TO OFFICE 12/26/2003
Power Issued: 01/04/2001 Response:  

Follow-Up:
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z085598
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/08/2001 05/10/2001 PGR N (25) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 06/07/2001 06/11/2001 PGR V G (30) (8)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 12/19/2003 12/26/2003 GYM H X E (50) (0) Y