Premises: 561 WEST END AVENUE MANHATTAN BIN: 1033974     Block: 1249   Lot: 29
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 565 W END AV Census Tract:   175 Health Area:  3120
085988 NONE Admin Area:   Z - UPPER MANHATTAN Inspection Area:   D
NEW YORK, NY 10024 Community Board:   107
DOB Cross Street(s):   WEST 87 STREET,    WEST 88 STREET
Status:   P - OBJECTN PENDING AT CONTRACTOR 07/21/2000
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   05/24/2000 Job Start Date:   05/22/2000
Last Change:   02/19/2019 Job End Date:   06/07/2000
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   GLAUBERZON, V       On     07/18/2000      
Field Disp:   V - OBJCTN ISSD: JOB INCOMPLT
Energize Recommendation:  
Objection Disposition:  

License #: 013007 Licensee Name: FINTAN J MURRAY
Firm: 003054 Firm Name: MIDLAND ELEC'L CO., INC.
Firm Phone: 718-894-4300  Firm Address: 37-31 58TH STREET WOODSIDE NY 11377 

Historical Licensees and Firms:
License # Licensee Name Firm # Firm Name  
011138 BEITLER, ALAN H 003054 MIDLAND ELEC'L CO., INC.

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $74.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: RECTHTER WILLIAM
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 57  41  31  134                
Total Units : 268 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 07/21/2000
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z083120
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/18/2000 07/21/2000 VG1 V (40) (3)
INSPECTION COMMENTS: No Inspection Comments For This Application