Electrical Application Details for App #: Z082517
Premises: 49 WEST 62 STREET MANHATTAN BIN: 1027461     Block: 1115   Lot: 7502
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 61 W 62 ST Census Tract:   149 Health Area:  4000
1602/099517 3RD FLOOR Admin Area:   Z - UPPER MANHATTAN Inspection Area:   E
NEW YORK, NY 10023 Community Board:   107
DOB Cross Street(s):   BROADWAY,    COLUMBUS AVENUE
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   04/04/2000 Job Start Date:   02/15/2000
Last Change:   08/22/2025 Job End Date:   06/15/2000
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   CASTRO MARIO       On     09/08/2006      
Field Disp:   L - LOCATION PROBLEM
Energize Recommendation:  
Objection Disposition:  

License #: 010487 Licensee Name: CIRO LUPO
Firm: 001787 Firm Name: COMMERCIAL ELECT CONT INC
Firm Phone: 718-784-3500  Firm Address: 10-28 47TH AVENUE LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $431.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: COLUMBIA UNIVERSITY PRESS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  
D. 3 Phase Over 225 AMPS  3  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 104  225    62  204                
Total Units : 595 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  RISER DIAGRAM ENCLOSED

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Z082517
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/17/2002 10/23/2002 PC2 P (45) (0)
INSPECTION COMMENTS: NO ACCESS TO PNLS LISTED
 
(2) 05/20/2005 06/01/2005 MCT L (60) (0) Y
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 03/10/2006 03/28/2006 MCT Z (0) (0) Y
INSPECTION COMMENTS: NONE
 
(4) 09/08/2006 09/15/2006 MCT L (30) (0) Y
INSPECTION COMMENTS: NONE