![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y184782 | ||
| Premises: 1103 HOE AVENUE BRONX | BIN: 2006044 Block: 2744 Lot: 41 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 1103 HOE AV | Census Tract: 127.01 | Health Area: 3600 | |
| HOUSE | Admin Area: Y - BRONX | Inspection Area: C | ||
| BRONX, NY 10459 | Community Board: 202 | |||
| DOB Cross Street(s): WEST FARMS ROAD, EAST 167 STREET | |||
| Status: C - JOB IS SIGNED OFF 02/07/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/09/2017 5:40 PM | |
| Application Entered: 10/09/2017 | Job Start Date: 10/09/2017 | ||
| Last Change: 02/07/2018 | Job End Date: 02/28/2018 | ||
| Appointment Status: | |||
| Last Inspection By: DIMAGGIO, PHILLIP On 01/30/2018 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011281 | Licensee Name: | MIKHAIL RABINOVICH | |
| Firm: | 002683 | Firm Name: | KINGS ELECTRIC CO., INC. | |
| Firm Phone: | 718-209-8439 | Firm Address: | 6921 8TH AVENUE BROOKLYN NY 11228 | |
| Work Started or Filed by Others: YES | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY |
Total Fee: $102.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: C - Three Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | KELVIN BASDEO | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 4 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 4 | + New Meters | 4 | - Removed Meters | 4 | = Total Meters | 4 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/09/2017 | Notice: | |
| Power Issued: | 10/09/2017 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 01/30/2018 | 02/01/2018 | PDI | C | (45) | (0) | Y | |||
| INSPECTION COMMENTS: | PASS | |||||||||