![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y184408 | ||
| Premises: 2145 CLINTON AVENUE BRONX | BIN: 2086792 Block: 3098 Lot: 43 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 2145 CLINTON AV | Census Tract: 371 | Health Area: 1900 | |
| G/F & ROOF | Admin Area: Y - BRONX | Inspection Area: I | ||
| BRONX, NY 10457 | Community Board: 206 | |||
| DOB Cross Street(s): EAST 181 STREET, EAST 182 STREET | |||
| Status: C - JOB IS SIGNED OFF 10/06/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 09/14/2017 11:07 PM | |
| Application Entered: 09/14/2017 | Job Start Date: 09/18/2017 | ||
| Last Change: 10/06/2017 | Job End Date: 09/10/2018 | ||
| Appointment Status: | |||
| Last Inspection By: DIMAGGIO, PHILLIP On 09/27/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 012211 | Licensee Name: | JINFAR LIU | |
| Firm: | 003978 | Firm Name: | ACE ELEC'L CONSTRUCTION | |
| Firm Phone: | 347-368-4038 | Firm Address: | 130-17 23RD AVENUE EXPERT CORP COLLEGE POINT NY 11356 | |
| Other Licensees and Firms: | ||||
| License # | Licensee Name | Firm # | Firm Name | Type |
| 012831 | SOCOL, JEFFREY S | 003978 | ACE ELEC'L CONSTRUCTION | RESPONSIBLE REP |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
E - SUSTAINABLE ENERGY - SOLAR |
Total Fee: $78.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: A - One Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ELSA MENJIVAR | ||||||
| Owner Business Name: | N/A | ||||||
| Authorized Representative: BILL WANG | |||||||
| Relationship To Owner: GENERAL CONTRACTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| ROF | 20 | 6 | 1 | 5 | ||||||||
| Buildings Total | 6 | 5 | ||||||||||
| Total Units : 11 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALL 5.8KW PV SYSTEM WITH THE ASSOCIATED DEVICES AND WIRING | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 09/27/2017 | 09/27/2017 | PDI | C | (36) | (0) | Y | |||
| INSPECTION COMMENTS: | PASS | |||||||||