Electrical Application Details for App #: Y183607
Premises: 2860 SEDGWICK AVENUE BRONX BIN: 2086832     Block: 3250   Lot: 19
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 2860 SEDGWICK AV Census Tract:   267.02 Health Area:  0320
BASEMENT AND ROOF Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10468 Community Board:   208
DOB Cross Street(s):   WEST 229 STREET,    RESERVOIR AVENUE
Status:   C - JOB IS SIGNED OFF 05/18/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/27/2017 6:55 PM
Application Entered:   07/27/2017 Job Start Date:   07/27/2017
Last Change:   05/18/2018 Job End Date:   10/25/2017
Appointment Status:   
Last Inspection By:   JOFFRE PENA       On     04/30/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011398 Licensee Name: JOSEPH FERGUSON
Firm: 003192 Firm Name: AVALON ELECTRIC CORP.
Firm Phone: 718-543-2327  Firm Address: 5760 BROADWAY 2ND FLOOR BRONX NY 10463 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $5,040.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   CHURCH
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: OUR LADY OF ANGELS
Authorized Representative:  JOSIE MUZZILLO
Relationship To Owner:   PARISH MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  800AMPS
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  2 AWG
B. Over #2 to 1/0  1  #3THHN
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  5  4-600THHN 1-300THHN
SUB FEEDERS (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  250  250 KCMIL
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  200AMP MLO 42CIR
D. 3 Phase Over 225 AMPS  1  800AMP MDP
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS    13  12    13  12         
ROF            12         
Buildings Total 13  13    13     24           
Total Units : 67 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 1 + New Meters 1 - Removed Meters 1 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 07/27/2017 Notice:  
Power Issued: 07/27/2017 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  NEW SERVICE AND PANELS. NEW BRANCH CIRCUIT WIRING FOR LIGHTAND POWER

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y183607
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/30/2018 05/01/2018 JRP C (50) (0) Y
INSPECTION COMMENTS: PASS