![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y181926 | ||
| Premises: 3424 DEKALB AVENUE BRONX | BIN: 2017766 Block: 3327 Lot: 67 |
| DOB NOW: Inspections | |||||||||||
| Filed: | 3426 DEKALB AV | Census Tract: 421 | Health Area: 0410 | |
| CELLAR, 1ST FL, 2ND FL | Admin Area: Y - BRONX | Inspection Area: H | ||
| BRONX, NY 10467 | Community Board: 207 | |||
| DOB Cross Street(s): EAST 208 STREET, KOSSUTH AVENUE | |||
| Status: K - CLOSED/CANCELLED 12/23/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/05/2017 1:31 PM | |
| Application Entered: 04/05/2017 | Job Start Date: 04/06/2017 | ||
| Last Change: 12/23/2017 | Job End Date: 03/30/2018 | ||
| Appointment Status: | |||
| Last Inspection By: GIUSEPPE IMBURGIA On 12/22/2017 | |||
| Field Disp: K - OK TO CANCEL | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011769 | Licensee Name: | ZHENG LI | |
| Firm: | 003451 | Firm Name: | KJK ELECTRIC INC | |
| Firm Phone: | 917-682-3886 | Firm Address: | 79 BRIDGEWATER STREET BROOKLYN NY 11222 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $107.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | TSUI YEUNG | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| CEL | 4 | 8 | 2 | 4 | ||||||||
| 001 | 8 | 15 | 3 | 7 | 8 | |||||||
| 002 | 8 | 15 | 3 | 7 | 8 | |||||||
| Buildings Total | 20 | 38 | 6 | 16 | 20 | |||||||
| Total Units : 100 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: TO REMOVE ECB VIOLATIONS #34504282H, #34424536Z, #34504281X, #34504282H, AND #34524726H. | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/22/2017 | 12/23/2017 | GIG | K | (5) | (0) | Y | |||
| INSPECTION COMMENTS: | OK TO CANCEL SEE APP. # Y182099 | |||||||||