![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y180864 | ||
| Premises: 2496 MARION AVENUE BRONX | BIN: 2096866 Block: 3026 Lot: 9 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 2496 MARION AV | Census Tract: 399.02 | Health Area: 0900 | |
| BASEMENT, 1ST, ROOF | Admin Area: Y - BRONX | Inspection Area: F | ||
| BRONX, NY 10458 | Community Board: 205 | |||
| DOB Cross Street(s): EAST 188 STREET, EAST FORDHAM ROAD | |||
| Status: C - JOB IS SIGNED OFF 01/24/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/20/2017 1:00 AM | |
| Application Entered: 01/20/2017 | Job Start Date: 02/21/2017 | ||
| Last Change: 01/24/2018 | Job End Date: 12/20/2017 | ||
| Appointment Status: | |||
| Last Inspection By: GIUSEPPE IMBURGIA On 11/16/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011398 | Licensee Name: | JOSEPH FERGUSON | |
| Firm: | 003192 | Firm Name: | AVALON ELECTRIC CORP. | |
| Firm Phone: | 718-543-2327 | Firm Address: | 5760 BROADWAY 2ND FLOOR BRONX NY 10463 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING 7 - HVAC WIRING |
Total Fee: $758.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: CHURCH | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | OUR LADY OF MERCY CHURCH | ||||||
| Authorized Representative: JOSE AMBOOKEN | |||||||
| Relationship To Owner: PASTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 2 | 2 | 2 | 2 | ||||||||
| 001 | 13 | 17 | 32 | |||||||||
| ROF | 1 | 3 | 3 | 8 | ||||||||
| Buildings Total | 2 | 3 | 18 | 2 | 40 | |||||||
| Total Units : 65 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 1 | + New Meters | 1 | - Removed Meters | 1 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 01/20/2017 | Notice: | |
| Power Issued: | 01/20/2017 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: NEW POWER FOR HVAC SYSTEM. | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 11/16/2017 | 11/16/2017 | GIG | C | (40) | (0) | Y | |||
| INSPECTION COMMENTS: | INSPECTION PASSED | |||||||||