Electrical Application Details for App #: Y180551
Premises: 925 HUNTS POINT AVENUE BRONX BIN: 2129345     Block: 2735   Lot: 20
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 925 HUNTS POINT AV Census Tract:   89 Health Area:  3700
* Admin Area:   Y - BRONX Inspection Area:   C
BRONX, NY 10459 Community Board:   202
Special Place Name:   BOSTON MARKET
DOB Cross Street(s):   BRUCKNER BOULEVARD,    EAST 163 STREET
Status:   C - JOB IS SIGNED OFF 09/20/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/20/2016 4:03 PM
Application Entered:   12/20/2016 Job Start Date:   12/21/2016
Last Change:   09/20/2017 Job End Date:   12/21/2018
Appointment Status:   
Last Inspection By:   JOFFRE PENA       On     09/15/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011889 Licensee Name: MICHAEL L KAUFMAN
Firm: 003519 Firm Name: ESSENTIAL ELECTRIC CORP
Firm Phone: 212-725-1098  Firm Address: 32 EAST 31ST STREET-8TH FL NEW YORK NY 10016 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
T - TEMPORARY LIGHT & POWER
Total Fee:  $40.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   K - Store
Store / Other:   RESTAURANT
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: DAVID BLUMENFELD
Owner Business Name: BDG SUKA LLC
Authorized Representative:  PAUL TAGLIAFERRI
Relationship To Owner:   CONSTRUCTION MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001                 
Buildings Total                 
Total Units : 12 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y180551
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/15/2017 09/18/2017 JRP C (15) (0) Y
INSPECTION COMMENTS: ALL TEMP LIGHT AND POWER REMOVED PRIOR INSPECTION