![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y175936 | ||
| Premises: 2407 MORRIS AVENUE BRONX | BIN: 2014039 Block: 3184 Lot: 66 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 2407 MORRIS AV | Census Tract: 239 | Health Area: 1600 | |
| BASEMENT BOILER ROOM | Admin Area: Y - BRONX | Inspection Area: F | ||
| BRONX, NY 10468 | Community Board: 205 | |||
| DOB Cross Street(s): EAST 184 STREET, EAST FORDHAM ROAD | |||
| Status: C - JOB IS SIGNED OFF 12/22/2015 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 12/16/2015 7:28 PM | |
| Application Entered: 12/16/2015 | Job Start Date: 12/16/2015 | ||
| Last Change: 12/22/2015 | Job End Date: 12/16/2015 | ||
| Appointment Status: | |||
| Last Inspection By: GIUSEPPE IMBURGIA On 12/22/2015 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010968 | Licensee Name: | FRANCIS CAPORALE | |
| Firm: | 002308 | Firm Name: | BLAZE ELECTRIC INC. | |
| Firm Phone: | 718-369-0810 | Firm Address: | 681 5TH AVENUE BROOKLYN NY 11215 | |
| Work Started or Filed by Others: YES | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 9 - OTHER |
Total Fee: $52.00 | ||||||
| Other Work: BULLETIN #8 | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: B - BOILER CONTROLS J-51 CERTIFICATION | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | MARK SPITZ | ||||||
| Owner Business Name: | FJC 2407 MORRIS LLC | ||||||
| Authorized Representative: MARK SPITZ | |||||||
| Relationship To Owner: AGENT | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 1 | 2 | ||||||||||
| Buildings Total | 2 | |||||||||||
| Total Units : 2 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/22/2015 | 12/22/2015 | GIG | C | (22) | (0) | Y | |||
| INSPECTION COMMENTS: | INSPECTION PASSED | |||||||||