Electrical Application Details for App #: Y175184
Premises: 3529 DEKALB AVENUE BRONX BIN: 2017798     Block: 3328   Lot: 46
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 3535 DEKALB AV Census Tract:   431 Health Area:  0410
L-6 Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10467 Community Board:   207
DOB Cross Street(s):   EAST GUN HILL ROAD,    EAST 212 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/18/2015 9:44 AM
Application Entered:   10/18/2015 Job Start Date:   11/15/2015
Last Change:   08/22/2025 Job End Date:   11/15/2018
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   GIUSEPPE IMBURGIA       On     09/16/2016      
Field Disp:   V - OBJCTN ISSD: JOB INCOMPLT
Energize Recommendation:  
Objection Disposition:  

License #: 011986 Licensee Name: ANTHONY LUCIANO
Firm: 003652 Firm Name: JAM ELECTRICAL CORP
Firm Phone: 212-265-0142  Firm Address: 1133 6TH AVE 28TH FLOOR NEW YORK NY 10036 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $165.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: FLO WILGUS
Owner Business Name: TOPOROVSKY & SONS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  ELEVATOR
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 09/16/2016
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  MODERNIZATION OF ELEVATOR DEVICE #2P3010 BY ELEVATOR COMPANY IN CONJUNCTION WITH ELEVATOR APPLICATION(273018E). ELEVATOR CONTROL AND LOAD SIDE WIRING ONLY UL-22

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y175184
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/16/2016 09/16/2016 GIG V (36) (1)
INSPECTION COMMENTS: INSPECTION FAILED OBJECTION ISSUED

OBJECTION FOR APPLICATION #: Y175184
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 ( 10) BRANCH CIRCUIT CONDUCTORS ARE NOT PROPER SIZE
(ROOF)14 AWG USED FOR CAB LIGHTS DISCONNECT NYC AMENDMENTS SECTION 210.24
OPEN 09/16/2016 09/16/2016