BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y173050
Premises: 499 EAST 188 STREET BRONX BIN: 2127594     Block: 3058   Lot: 41
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 499 E 188 ST Census Tract:   387 Health Area:  1000
THROUGHOUT Admin Area:   Y - BRONX Inspection Area:   I
BRONX, NY 10458 Community Board:   206
Related Job Number:    201066489
DOB Cross Street(s):   WASHINGTON AVENUE,    BATHGATE AVENUE
Status:   C - JOB IS SIGNED OFF 06/01/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/12/2015 8:19 PM
Application Entered:   05/12/2015 Job Start Date:   05/13/2015
Last Change:   06/01/2016 Job End Date:   06/13/2015
Appointment Status:   
Last Inspection By:   SCHIAVO, JAMES       On     06/24/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 010379 Licensee Name: ANTE KRSLOVIC
Firm: 000875 Firm Name: LINA ELECTRIC, CORP
Firm Phone: 718-956-6341  Firm Address: 45-14 251ST SUITE 127 LITTLENECK NY 11362 

Work Started or Filed by Others: YES
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $1,410.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: PHILLIP MORROW
Owner Business Name: BRONX NY E188 ST APTS LP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  2  3 PHASE 200 AMP
C. 201 Up to 600 AMPS  2  3 PHASE 200 AMP
D. 601 Up to 1200 AMPS  1  100A
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  3  4X500 MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  40  APT PANELS
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  HOUSE PANEL
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 40 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 41 - Removed Meters 0 = Total Meters 41

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 05/12/2015 Notice:  
Power Issued: 05/12/2015 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y173050
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/24/2015 06/30/2015 JSV C E (35) (0) Y
INSPECTION COMMENTS: C




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back